PROPT Optimal Control Examples: Difference between revisions

From TomWiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 2: Line 2:
*[[PROPT Acrobot|Acrobot]]
*[[PROPT Acrobot|Acrobot]]
*[[PROPT A Linear Problem with Bang Bang Control|A Linear Problem with Bang Bang Control]]
*[[PROPT A Linear Problem with Bang Bang Control|A Linear Problem with Bang Bang Control]]
*[[PROPT Batch Fermentor|Batch Fermentor]]
*[[PROPT Batch Production|Batch Production]]
*[[PROPT Batch Production|Batch Production]]
*[[PROPT Batch Reactor Problem|Batch Reactor Problem]]
*[[PROPT Batch Reactor Problem|Batch Reactor Problem]]
Line 86: Line 87:
*[[PROPT Robot Arm Movement|Robot Arm Movement]]
*[[PROPT Robot Arm Movement|Robot Arm Movement]]
*[[PROPT Time-optimal Trajectories for Robot Manipulators|Time-optimal Trajectories for Robot Manipulators]]
*[[PROPT Time-optimal Trajectories for Robot Manipulators|Time-optimal Trajectories for Robot Manipulators]]
*[[PROPT Satellite Control|Satellite Control]]
*[[PROPT Second Order System|Second Order System]]
*[[PROPT Space Shuttle Reentry|Space Shuttle Reentry]]
*[[PROPT Simple Bang Bang Problem|Simple Bang Bang Problem]]
*[[PROPT Singular Arc Problem|Singular Arc Problem]]
*[[PROPT Singular CSTR|Singular CSTR]]
*[[PROPT Singular Control 1|Singular Control 1]]
*[[PROPT Singular Control 2|Singular Control 2]]
*[[PROPT Singular Control 3|Singular Control 3]]
*[[PROPT Singular Control 4|Singular Control 4]]
*[[PROPT Singular Control 5|Singular Control 5]]
*[[PROPT Singular Control 6|Singular Control 6]]
*[[PROPT Spring Mass Damper (2 Degree Freedom)|Spring Mass Damper (2 Degree Freedom)]]
*[[PROPT Stirred Tank|Stirred Tank]]
*[[PROPT Temperature Control|Temperature Control]]
*[[PROPT Room temperature control|Room temperature control]]
*[[PROPT A Simple Terminal Constraint Problem|A Simple Terminal Constraint Problem]]
*[[PROPT Third order system|Third order system]]
*[[PROPT Time Delay 1|Time Delay 1]]
*[[PROPT Time Delay 1 (Approximate)|Time Delay 1 (Approximate)]]
*[[PROPT Time Delay 2|Time Delay 2]]
*[[PROPT Time Delay 2 (Approximate)|Time Delay 2 (Approximate)]]
*[[PROPT Transfer Min Swing|Transfer Min Swing]]
*[[PROPT Tubular Reactor|Tubular Reactor]]
*[[PROPT Turbo Generator|Turbo Generator]]
*[[PROPT Two-Link Robot|Two-Link Robot]]
*[[PROPT Two-Link Robotic Arm|Two-Link Robotic Arm]]
*[[PROPT Two-Phase Schwartz|Two-Phase Schwartz]]
*[[PROPT Two Stage CSTR|Two Stage CSTR]]
*[[PROPT Van der Pol Oscillator|Van der Pol Oscillator]]
*[[PROPT Zermelos problem (version 1)|Zermelos problem (version 1)]]
*[[PROPT Zermelos problem (version 2)|Zermelos problem (version 2)]]

Revision as of 09:09, 8 November 2011

Notice.png

This page is part of the PROPT Manual. See PROPT Manual.