PROPT Optimal Control Examples: Difference between revisions
From TomWiki
Jump to navigationJump to search
(Created page with "{{Part Of Manual|title=the PROPT Manual|link=PROPT Manual}} *Acrobot") |
No edit summary |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Part Of Manual|title=the PROPT | {{Part Of Manual|title=the PROPT Manual|link=[[PROPT|PROPT Manual]]}} | ||
*[[PROPT | *[[PROPT Acrobot|AC-robot]] | ||
*[[PROPT A Linear Problem with Bang Bang Control|A Linear Problem with Bang Bang Control]] | |||
*[[PROPT Batch Fermentor|Batch Fermentor]] | |||
*[[PROPT Batch Production|Batch Production]] | |||
*[[PROPT Batch Reactor Problem|Batch Reactor Problem]] | |||
*[[PROPT The Brachistochrone Problem|The Brachistochrone Problem]] | |||
*[[PROPT The Brachistochrone Problem (DAE formulation)|The Brachistochrone Problem (DAE formulation)]] | |||
*[[PROPT Bridge Crane System|Bridge Crane System]] | |||
*[[PROPT Bryson-Denham Problem|Bryson-Denham Problem]] | |||
*[[PROPT Bryson-Denham Problem (Detailed)|Bryson-Denham Problem (Detailed)]] | |||
*[[PROPT Bryson-Denham Problem (Short version)|Bryson-Denham Problem (Short version)]] | |||
*[[PROPT Bryson-Denham Two Phase Problem|Bryson-Denham Two Phase Problem]] | |||
*[[PROPT Bryson Maxrange|Bryson Maxrange]] | |||
*[[PROPT Catalyst Mixing|Catalyst Mixing]] | |||
*[[PROPT Catalytic Cracking of Gas Oil|Catalytic Cracking of Gas Oil]] | |||
*[[PROPT Flow in a Channel|Flow in a Channel]] | |||
*[[PROPT Coloumb Friction 1|Coloumb Friction 1]] | |||
*[[PROPT Coloumb Friction 2|Coloumb Friction 2]] | |||
*[[PROPT Continuous State Constraint Problem|Continuous State Constraint Problem]] | |||
*[[PROPT Curve Area Maximization|Curve Area Maximization]] | |||
*[[PROPT Denbigh's System of Reactions|Denbigh's System of Reactions]] | |||
*[[PROPT Dielectrophoresis Particle Control|Dielectrophoresis Particle Control]] | |||
*[[PROPT Disturbance Control|Disturbance Control]] | |||
*[[PROPT Drug Displacement Problem|Drug Displacement Problem]] | |||
*[[PROPT Optimal Drug Scheduling for Cancer Chemotherapy|Optimal Drug Scheduling for Cancer Chemotherapy]] | |||
*[[PROPT Euler Buckling Problem|Euler Buckling Problem]] | |||
*[[PROPT MK2 5-Link robot|MK2 5-Link robot]] | |||
*[[PROPT Flight Path Tracking|Flight Path Tracking]] | |||
*[[PROPT Food Sterilization|Food Sterilization]] | |||
*[[PROPT Free Floating Robot|Free Floating Robot]] | |||
*[[PROPT Fuller Phenomenon|Fuller Phenomenon]] | |||
*[[PROPT Genetic 1|Genetic 1]] | |||
*[[PROPT Genetic 2|Genetic 2]] | |||
*[[PROPT Global Dynamic System|Global Dynamic System]] | |||
*[[PROPT Goddard Rocket, Maximum Ascent|Goddard Rocket, Maximum Ascent]] | |||
*[[PROPT Goddard Rocket, Maximum Ascent, Final time free, Singular solution|Goddard Rocket, Maximum Ascent, Final time free, Singular solution]] | |||
*[[PROPT Goddard Rocket, Maximum Ascent, Final time fixed, Singular solution|Goddard Rocket, Maximum Ascent, Final time fixed, Singular solution]] | |||
*[[PROPT Greenhouse Climate Control|Greenhouse Climate Control]] | |||
*[[PROPT Grusins Metric|Grusins Metric]] | |||
*[[PROPT Hang Glider Control|Hang Glider Control]] | |||
*[[PROPT Hanging Chain|Hanging Chain]] | |||
*[[PROPT High Dimensional Control|High Dimensional Control]] | |||
*[[PROPT Hyper Sensitive Optimal Control|Hyper Sensitive Optimal Control]] | |||
*[[PROPT Initial Value Problem|Initial Value Problem]] | |||
*[[PROPT Isometrization of alpha pinene|Isometrization of alpha pinene]] | |||
*[[PROPT Isoperimetric Constraint Problem|Isoperimetric Constraint Problem]] | |||
*[[PROPT Jumbo Crane Container Control|Jumbo Crane Container Control]] | |||
*[[PROPT Lee-Ramirez Bioreactor|Lee-Ramirez Bioreactor]] | |||
*[[PROPT Linear Tangent Steering Problem|Linear Tangent Steering Problem]] | |||
*[[PROPT Linear Gas Absorber|Linear Gas Absorber]] | |||
*[[PROPT Linear Pendulum|Linear Pendulum]] | |||
*[[PROPT Linear Problem with Bang Bang Control|Linear Problem with Bang Bang Control]] | |||
*[[PROPT LQR Problem|LQR Problem]] | |||
*[[PROPT Marine Population Dynamics|Marine Population Dynamics]] | |||
*[[PROPT Max Radius Orbit Transfer|Max Radius Orbit Transfer]] | |||
*[[PROPT Sequential Activation of Metabolic Pathways|Sequential Activation of Metabolic Pathways]] | |||
*[[PROPT Methanol to Hydrocarbons|Methanol to Hydrocarbons]] | |||
*[[PROPT Min Energy Orbit Transfer|Min Energy Orbit Transfer]] | |||
*[[PROPT Minimum Climb Time (English Units)|Minimum Climb Time (English Units)]] | |||
*[[PROPT Missile Intercept|Missile Intercept]] | |||
*[[PROPT Moonlander Example|Moonlander Example]] | |||
*[[PROPT Multiphase Aircraft Trajectory Planning Example|Multiphase Aircraft Trajectory Planning Example]] | |||
*[[PROPT Nagurka Problem|Nagurka Problem]] | |||
*[[PROPT Nishida problem|Nishida problem]] | |||
*[[PROPT Nondifferentiable system|Nondifferentiable system]] | |||
*[[PROPT Nonlinear CSTR|Nonlinear CSTR]] | |||
*[[PROPT Obstacle Avoidance|Obstacle Avoidance]] | |||
*[[PROPT Oil Shale Pyrolysis|Oil Shale Pyrolysis]] | |||
*[[PROPT One Dimensional Rocket Ascent|One Dimensional Rocket Ascent]] | |||
*[[PROPT Parametric Sensitivity Control|Parametric Sensitivity Control]] | |||
*[[PROPT Orbit Raising Maximum Radius|Orbit Raising Maximum Radius]] | |||
*[[PROPT Orbit Raising Minimum Time|Orbit Raising Minimum Time]] | |||
*[[PROPT Parallel Reactions in Tubular Reactor|Parallel Reactions in Tubular Reactor]] | |||
*[[PROPT Parameter Estimation Problem|Parameter Estimation Problem]] | |||
*[[PROPT Park-Ramirez bioreactor|Park-Ramirez bioreactor]] | |||
*[[PROPT Path Tracking Robot|Path Tracking Robot]] | |||
*[[PROPT Path Tracking Robot (Two-Phase)|Path Tracking Robot (Two-Phase)]] | |||
*[[PROPT Pendulum Gravity Estimation|Pendulum Gravity Estimation]] | |||
*[[PROPT Penicillin Plant|Penicillin Plant]] | |||
*[[PROPT Plug-Flow Tubular Reactor|Plug-Flow Tubular Reactor]] | |||
*[[PROPT Quadratic constraint problem|Quadratic constraint problem]] | |||
*[[PROPT Quadruple Integral|Quadruple Integral]] | |||
*[[PROPT Radio telescope|Radio telescope]] | |||
*[[PROPT Rayleigh Unconstrained|Rayleigh Unconstrained]] | |||
*[[PROPT Rigid Body Rotation|Rigid Body Rotation]] | |||
*[[PROPT Robot Arm Movement|Robot Arm Movement]] | |||
*[[PROPT Time-optimal Trajectories for Robot Manipulators|Time-optimal Trajectories for Robot Manipulators]] | |||
*[[PROPT Satellite Control|Satellite Control]] | |||
*[[PROPT Second Order System|Second Order System]] | |||
*[[PROPT Space Shuttle Reentry|Space Shuttle Reentry]] | |||
*[[PROPT Simple Bang Bang Problem|Simple Bang Bang Problem]] | |||
*[[PROPT Singular Arc Problem|Singular Arc Problem]] | |||
*[[PROPT Singular CSTR|Singular CSTR]] | |||
*[[PROPT Singular Control 1|Singular Control 1]] | |||
*[[PROPT Singular Control 2|Singular Control 2]] | |||
*[[PROPT Singular Control 3|Singular Control 3]] | |||
*[[PROPT Singular Control 4|Singular Control 4]] | |||
*[[PROPT Singular Control 5|Singular Control 5]] | |||
*[[PROPT Singular Control 6|Singular Control 6]] | |||
*[[PROPT Spring Mass Damper (2 Degree Freedom)|Spring Mass Damper (2 Degree Freedom)]] | |||
*[[PROPT Stirred Tank|Stirred Tank]] | |||
*[[PROPT Temperature Control|Temperature Control]] | |||
*[[PROPT Room temperature control|Room temperature control]] | |||
*[[PROPT A Simple Terminal Constraint Problem|A Simple Terminal Constraint Problem]] | |||
*[[PROPT Third order system|Third order system]] | |||
*[[PROPT Time Delay 1|Time Delay 1]] | |||
*[[PROPT Time Delay 1 (Approximate)|Time Delay 1 (Approximate)]] | |||
*[[PROPT Time Delay 2|Time Delay 2]] | |||
*[[PROPT Time Delay 2 (Approximate)|Time Delay 2 (Approximate)]] | |||
*[[PROPT Transfer Min Swing|Transfer Min Swing]] | |||
*[[PROPT Tubular Reactor|Tubular Reactor]] | |||
*[[PROPT Turbo Generator|Turbo Generator]] | |||
*[[PROPT Two-Link Robot|Two-Link Robot]] | |||
*[[PROPT Two-Link Robotic Arm|Two-Link Robotic Arm]] | |||
*[[PROPT Two-Phase Schwartz|Two-Phase Schwartz]] | |||
*[[PROPT Two Stage CSTR|Two Stage CSTR]] | |||
*[[PROPT Van der Pol Oscillator|Van der Pol Oscillator]] | |||
*[[PROPT Zermelos problem (version 1)|Zermelos problem (version 1)]] | |||
*[[PROPT Zermelos problem (version 2)|Zermelos problem (version 2)]] | |||
[[Category:PROPT]] |
Latest revision as of 11:44, 10 April 2012
This page is part of the PROPT Manual. See PROPT Manual. |
- AC-robot
- A Linear Problem with Bang Bang Control
- Batch Fermentor
- Batch Production
- Batch Reactor Problem
- The Brachistochrone Problem
- The Brachistochrone Problem (DAE formulation)
- Bridge Crane System
- Bryson-Denham Problem
- Bryson-Denham Problem (Detailed)
- Bryson-Denham Problem (Short version)
- Bryson-Denham Two Phase Problem
- Bryson Maxrange
- Catalyst Mixing
- Catalytic Cracking of Gas Oil
- Flow in a Channel
- Coloumb Friction 1
- Coloumb Friction 2
- Continuous State Constraint Problem
- Curve Area Maximization
- Denbigh's System of Reactions
- Dielectrophoresis Particle Control
- Disturbance Control
- Drug Displacement Problem
- Optimal Drug Scheduling for Cancer Chemotherapy
- Euler Buckling Problem
- MK2 5-Link robot
- Flight Path Tracking
- Food Sterilization
- Free Floating Robot
- Fuller Phenomenon
- Genetic 1
- Genetic 2
- Global Dynamic System
- Goddard Rocket, Maximum Ascent
- Goddard Rocket, Maximum Ascent, Final time free, Singular solution
- Goddard Rocket, Maximum Ascent, Final time fixed, Singular solution
- Greenhouse Climate Control
- Grusins Metric
- Hang Glider Control
- Hanging Chain
- High Dimensional Control
- Hyper Sensitive Optimal Control
- Initial Value Problem
- Isometrization of alpha pinene
- Isoperimetric Constraint Problem
- Jumbo Crane Container Control
- Lee-Ramirez Bioreactor
- Linear Tangent Steering Problem
- Linear Gas Absorber
- Linear Pendulum
- Linear Problem with Bang Bang Control
- LQR Problem
- Marine Population Dynamics
- Max Radius Orbit Transfer
- Sequential Activation of Metabolic Pathways
- Methanol to Hydrocarbons
- Min Energy Orbit Transfer
- Minimum Climb Time (English Units)
- Missile Intercept
- Moonlander Example
- Multiphase Aircraft Trajectory Planning Example
- Nagurka Problem
- Nishida problem
- Nondifferentiable system
- Nonlinear CSTR
- Obstacle Avoidance
- Oil Shale Pyrolysis
- One Dimensional Rocket Ascent
- Parametric Sensitivity Control
- Orbit Raising Maximum Radius
- Orbit Raising Minimum Time
- Parallel Reactions in Tubular Reactor
- Parameter Estimation Problem
- Park-Ramirez bioreactor
- Path Tracking Robot
- Path Tracking Robot (Two-Phase)
- Pendulum Gravity Estimation
- Penicillin Plant
- Plug-Flow Tubular Reactor
- Quadratic constraint problem
- Quadruple Integral
- Radio telescope
- Rayleigh Unconstrained
- Rigid Body Rotation
- Robot Arm Movement
- Time-optimal Trajectories for Robot Manipulators
- Satellite Control
- Second Order System
- Space Shuttle Reentry
- Simple Bang Bang Problem
- Singular Arc Problem
- Singular CSTR
- Singular Control 1
- Singular Control 2
- Singular Control 3
- Singular Control 4
- Singular Control 5
- Singular Control 6
- Spring Mass Damper (2 Degree Freedom)
- Stirred Tank
- Temperature Control
- Room temperature control
- A Simple Terminal Constraint Problem
- Third order system
- Time Delay 1
- Time Delay 1 (Approximate)
- Time Delay 2
- Time Delay 2 (Approximate)
- Transfer Min Swing
- Tubular Reactor
- Turbo Generator
- Two-Link Robot
- Two-Link Robotic Arm
- Two-Phase Schwartz
- Two Stage CSTR
- Van der Pol Oscillator
- Zermelos problem (version 1)
- Zermelos problem (version 2)