We look at the optimization problem of maximizing the revenue of a hydroelectric dam. This problem was published by By Seth DeLand of the MathWorks, as an example of how to combine their optimization and symbolic toolboxes. [1] We solve the same probem using tomSym and the TOMLAB solvers, noting a XXX times speed up. The problem can be solved in seconds with TOMLAB, as compared to hours with the MathWork's toolboxes.
The dynamics of the dam is described by the following equations.
Electricity(t) = TurbineFlow(t-1)*[½ k1(Storage(t) + Storage(t-1)) + k2]
Storage(t) = Storage(t-1) + ∆t * [inFlow(t-1) - spillFlow(t-1) - turbineFlow(t-1)]
The actual data used by DeLand can be downloaded from Matlab Central.[2] To avoid attaching data files to our example, we will use an approximation to this data, as generated by the following Matlab code:
N = 480;
t = (0:N-1)';
inFlow = reshape(repmat(10*(107+[0 0 0 -3 3 2 2 -8 9 5 0 1 -6 -4 5 0 -6 -6 -17 -7]),24,1),N,1);
price = 46 + t./57 - 3*cos((t+46)/43) - 4*sin(pi/12*(t+4)) - 4*sin(pi/6*(t+1));
(The timing tests were run using both the original and the approximated data. There was no detectable difference in runtimes.)
A few other consants are defined by DeLand as follows:
stor0 = 90000; % initial vol. of water stored in the reservoir (Acre-Feet)
k1 = 0.00003; % K-factor coefficient
k2 = 9; % K-factor offset
MW2kW = 1000; % MW to kW
C2A = 1.98347/24; % Convert from CFS to AF/HR
One the input data is defined, this is the entire code used to set up and solve the problem with TOMLAB:
turbineFlow = tom('turbineFlow',N,1);
spillFlow = tom('spillFlow',N,1);
outFlow = turbineFlow + spillFlow;
storage = stor0 + C2A*cumsum(inFlow - outFlow);
electricity = turbineFlow.*(0.5*k1*(storage + [stor0; storage(1:end-1)]) + k2)./MW2kW;
revenue = price*electricity;
objective = -revenue; % Minimization objective
constraints = {
0 <= turbineFlow <= 25000
0 <= spillFlow
-500 <= diff(outFlow) <= 500
outFlow >= 500
50000 <= storage <= 100000
storage(end) == stor0
};
guess = [];
options = struct;
options.solver = 'snopt';
solution = ezsolve(objective, constraints, guess, options);
The above code passes the same Hessian to the solver as DeLand's code. It is possible to get a much sparser Hessian, by making the water level a decision variable, instead of a symbolic expression. All we need to do is to replace the previous expression for "storage" by a symbol definition:
storage = tom('storage',N,1);
and then add one constraint
constraints{end+1} = ( storage == [stor0; storage(1:N-1)] + inFlow - outFlow );