Problem description
We consider the military telecommunications network represented below. This network consists of eleven sites connected by bidirectional lines for data transmission. For reliability reasons in the case of a conflict, the specifications require that the two sites (nodes) 10 and 11 of the network remain able to communicate even if any three other sites of the network are destroyed. Does the network satisfy this requirement?
1 --- 2 ---------- 8
/ | / | / | / | / | / | / | / | / | | | 11 --- 3 ---+---- 10 | | | | \ / \ | / | \ | | X \ | / | | | | / \ \ | / | | | | | | 4 --- 5 --- 9 | | | | | | \ | / | | \ | / \ | \ | / \ | \ ----- 6 ---------- 7
Variables
arcs_out/in For an arc i arcs_out(i) is its starting node and arcs_in(i) ts target node
Reference
Applications of optimization... Gueret, Prins, Seveaux
% Marcus Edvall, Tomlab Optimization Inc, E-mail: tomlab@tomopt.com
% Copyright (c) 2005-2009 by Tomlab Optimization Inc., $Release: 7.2.0$
% Written Oct 7, 2005. Last modified Apr 8, 2009.
Problem setup
arcs_in = [1 1 1 2 2 2 3 3 3 3 4 4 4 5 5 6 6 6 7 7 8 9]';
arcs_out = [2 3 11 3 8 9 4 9 10 11 5 6 11 9 11 7 9 10 8 10 10 10]';
n1 = length(arcs_in); % arcs_in
n = 2*n1; % bi-directional
nodes = length(unique([arcs_in; arcs_out]));
arcs_in_new = [arcs_in;arcs_out];
arcs_out = [arcs_out;arcs_in];
arcs_in = arcs_in_new;
arcs = tom('arcs',n,1,'int');
% All variables are binary.
bnds = {0 <= arcs <= 1};
% Kirchhoff's law, 1 source and 1 sink
con1 = cell(nodes-2,1);
for i=1:nodes-2 %Assuming 10 and 11 are source and sink
idx1 = find(arcs_in == i);
idx3 = find(arcs_out == i);
con1{i} = {sum(arcs(idx1)) == sum(arcs(idx3))};
end
% Limit flow in intermediate node
con2 = cell(nodes-2,1);
for i=1:nodes-2 %Assuming 10 and 11 are source and sink
idx1 = find(arcs_in == i);
con2{i} = {sum(arcs(idx1)) <= 1};
end
% Source has no incoming flows
idx1 = find(arcs_out == nodes-1);
con3 = {sum(arcs(idx1)) == 0};
% Objective
idx1 = find(arcs_in == (nodes-1));
objective = -sum(arcs(idx1));
constraints = {bnds, con1, con2, con3};
options = struct;
options.solver = 'cplex';
options.name = 'Network Reliability';
sol = ezsolve(objective,constraints,[],options);
PriLev = 1;
if PriLev > 0
f = -subs(objective,sol);
x = -sol.arcs;
disp(['The network can manage the loss of ' num2str(f-1) ' nodes.']);
disp(['There are ' num2str(f) ' disjunctive paths.']);
[arcs,direction] = find(reshape(x,length(arcs_in)/2,2));
disp('For a maximal number of disjunctive paths, activate...');
for arc = 1:length(arcs),
if direction(arc) == 1,
disp([' arc ' num2str([arcs_out(arcs(arc))]) '->' ...
num2str([arcs_in(arcs(arc))])]);
end
if direction(arc) == 2,
disp([' arc ' num2str([arcs_in(arcs(arc))]) '->' ...
num2str([arcs_out(arcs(arc))])]);
end
end
end
% MODIFICATION LOG
%
% 051107 med Created.
% 060116 per Added documentation.
% 060126 per Moved disp to end
% 090308 med Converted to tomSym
Problem type appears to be: mip Time for symbolic processing: 0.094701 seconds Starting numeric solver ===== * * * =================================================================== * * * TOMLAB - TOMLAB Development license 999007. Valid to 2011-12-31 ===================================================================================== Problem: --- 1: Network Reliability f_k -4.000000000000000000 f(x_0) 0.000000000000000000 Solver: CPLEX. EXIT=0. INFORM=101. CPLEX Branch-and-Cut MIP solver Optimal integer solution found FuncEv 7 Elapsed time: 0.003000 sec. The network can manage the loss of 3 nodes. There are 4 disjunctive paths. For a maximal number of disjunctive paths, activate... arc 11->1 arc 11->3 arc 11->4 arc 11->5 arc 8->7 arc 1->2 arc 2->8 arc 3->10 arc 4->6 arc 5->9 arc 6->10 arc 7->10 arc 9->10