| 21 |
The maximum primal infeasibility or, equivalently, the maximum bound violation including slacks for the unscaled problem.
|
| 22 |
The maximum primal infeasibility or, equivalently, the maximum bound violation including slacks for the scaled problem.
|
| 23 |
The sum of primal infeasibilities or, equivalently, the sum of bound violations for the unscaled problem.
|
| 24 |
The sum of primal infeasibilities or, equivalently, the sum of bound violations for the scaled problem.
|
| 25 |
(S,B) The maximum of dual infeasibility or, equivalently, the maximum reduced-cost infeasibility for the unscaled problem.
|
| 26 |
(S,B) The maximum of dual infeasibility or, equivalently, the maximum reduced-cost infeasibility for the scaled problem.
|
| 27 |
(S,B) The sum of dual infeasibilities or, equivalently, the sum of reduced-cost bound violations for the unscaled problem .
|
| 28 |
(S,B) The sum of dual infeasibilities or, equivalently, the sum of reduced-cost bound violations for the scaled problem .
|
| 29 |
(MIP) The maximum of integer infeasibility for the unscaled problem.
|
| 30 |
(MIP) The sum of integer infeasibilities for the unscaled problem.
|
| 31 |
Ax - b\| for the unscaled problem.
|
| 32 |
Ax - b\| for the scaled problem.
|
| 33 |
Ax - b\| for the unscaled problem.
|
| 34 |
Ax - b\| for the unscaled problem.
|
| 35 |
(S,B) The maximum dual residual value. For a simplex solution, this is the maximum of the vector -c-B'pi-, and for a barrier solution, it is the maximum of the vector -A'pi+rc-c- for the unscaled problem.
|
| 36 |
(S,B) The maximum dual residual value for the scaled problem.
|
| 37 |
(S,B) The sum of the absolute values of the dual residual vector for the unscaled problem.
|
| 38 |
(S,B) The sum of the absolute values of the dual residual vector for the scaled problem.
|
| 39 |
(B) The maximum violation of the complementary slackness conditions for the un- scaled problem.
|
| 41 |
(B) The sum of the violations of the complementary slackness conditions for the unscaled problem.
|
| 43 |
The maximum absolute value in the primal solution vector for the unscaled problem.
|
| 44 |
The maximum absolute value in the primal solution vector for the scaled problem.
|
| 45 |
(S,B) The maximum absolute value in the dual solution vector for the unscaled prob- lem.
|
| 46 |
(S,B) The maximum absolute value in the dual solution vector for the scaled problem.
|
| 47 |
The maximum absolute slack value for the unscaled problem.
|
| 48 |
The maximum absolute slack value for the scaled problem.
|
| 49 |
(S,B) The maximum absolute reduced cost value for the unscaled problem.
|
| 50 |
(S,B) The maximum absolute reduced cost value for the scaled problem.
|
| 51 |
The sum of the absolute values in the primal solution vector for the unscaled problem.
|
| 52 |
The sum of the absolute values in the primal solution vector for the scaled problem.
|
| 53 |
(S,B) The sum of the absolute values in the dual solution vector for the unscaled problem.
|
| 54 |
(S,B) The sum of the absolute values in the dual solution vector for the scaled problem.
|
| 55 |
The sum of the absolute slack values for the unscaled problem.
|
| 56 |
The sum of the absolute slack values for the scaled problem.
|
| 57 |
(S,B) The sum of the absolute reduced cost values for the unscaled problem.
|
| 58 |
(S,B) The sum of the absolute reduced cost values for the unscaled problem.
|
| 59 |
(S) The estimated condition number of the scaled basis matrix.
|
| 60 |
(B) The objective value gap between the primal and dual objective value solution.
|
| 61 |
(B) The objective value relative to the dual barrier solution.
|
| 62 |
(B) The objective value relative to the primal barrier solution.
|
| 81 |
(MIP) The relative objective gap for a MIP optimization.
|