Problem description

In the case of ice, all the streets of a village need to be gritted. A schematic map of the streets is given in the figure below. The nodes correspond to street intersections, the arcs to the streets that need to be gritted. The arcs are labeled with the length of the street in meters.

Graph of the village streets

--150->   --130->   --100->
  1         2         3         4
              <-140--   <-100--
 | ^      /| ^        ^        | ^
 | 165   / | 170      |        | 180
 | |    /  | |       200       | |
165|  230 160|        |       190|
 | |  /    | |        |        | |
 | | /     | |        |        | |
 V |V      V |        |        V |
    --144->   --128->
  5         6         7 --109-> 8
    <-144--   <-122--
  ^       /| ^      ^| ^      / |
  194    / |174    / | |     /  |
  |     /  | |    / 185|185 /   |
  |   218 174|  233  | |   /   190
  |   /    | |  /    | |  140   |
  |  /     | | /     | | /      |
  | V      V |/      V |V       V
9 --148-> 10 <-135- 11 -110-> 12

The highway maintenance depot with the gritting truck is located at intersection number 1. The truck has a sufficiently large capacity to grit all the streets during a single tour. Due to the one-way streets, it may be forced to pass several times through the same street that has already been gritted. Determine a tour for the gritting truck of minimum total length that passes through all streets. For bidirectional streets, both directions need to be gritted separately.

Variables

in/out                     Road i starts in in(i) and
                           goes out to out(i)
lengths                    Lengths of the roads

Reference

Applications of optimization... Gueret, Prins, Seveaux

% Marcus Edvall, Tomlab Optimization Inc, E-mail: tomlab@tomopt.com
% Copyright (c) 2005-2009 by Tomlab Optimization Inc., $Release: 7.2.0$
% Written Oct 7, 2005.   Last modified Apr 8, 2009.

Problem setup

in  =  [1 1 2 2 2 3 3 4 4 5 5 6 6 6 6  6 7 7 7  7 8  8  8 9 9 10 10 11 11 12]';
out =  [2 5 3 5 6 2 4 3 8 1 6 2 5 7 9 10 3 6 8 11 4 11 12 5 10 6  7  7 10 11]';

lengths = [150 165 130 230 160 140 100 100 190 165 144 170 144 128 218 174 ...
    200 122 109 185 180 141 190 194 148 174 233 185 135 110]';

n = length(lengths);     %Number of arcs

arcs = tom('arcs',n,1,'int');

% All variables are integer
bnds = {1 <= arcs};

% Districts chosen
n1   = length(unique([in;out]));
con = cell(n1,1);
for i=1:n1
    idxin  = find(i == in);
    idxout = find(i == out);
    con{i} = {sum(arcs(idxin)) == sum(arcs(idxout))};
end

% Objective
objective = lengths'*arcs;
constraints = {bnds, con};
options = struct;
options.solver = 'cplex';
options.name   = 'Gritting Roads';
sol = ezsolve(objective,constraints,[],options);

PriLev = 1;
if PriLev > 0
    twice  = find(sol.arcs > 1);
    disp('all roads travelled once, except:')
    for i  = 1:length(twice),
        idx  = twice(i);
        disp(['  road from ' num2str(in(idx)) ' to ' num2str(out(idx)) ...
            ' ( that is travelled ' num2str(sol.arcs(idx))   ' times)'])
    end
end

% MODIFICATION LOG
%
% 051206 med   Created
% 060118 per   Added documentation
% 060125 per   Moved disp to end
% 090325 med   Converted to tomSym
Problem type appears to be: mip
Time for symbolic processing: 0.070486 seconds
Starting numeric solver
===== * * * =================================================================== * * *
TOMLAB - TOMLAB Development license  999007. Valid to 2011-12-31
=====================================================================================
Problem: ---  1: Gritting Roads                 f_k    5990.000000000000000000
                                              f(x_0)      0.000000000000000000

Solver: CPLEX.  EXIT=0.  INFORM=101.
CPLEX Branch-and-Cut MIP solver
Optimal integer solution found

FuncEv    7 
CPU time: 0.015600 sec. Elapsed time: 0.003000 sec. 
all roads travelled once, except:
  road from 3 to 4 ( that is travelled 2 times)
  road from 4 to 8 ( that is travelled 2 times)
  road from 5 to 1 ( that is travelled 2 times)
  road from 5 to 6 ( that is travelled 2 times)
  road from 6 to 9 ( that is travelled 2 times)
  road from 10 to 6 ( that is travelled 2 times)
  road from 11 to 7 ( that is travelled 2 times)